mission-animasi
   

The BMS / Contromation group of companies have executed design, contruction, and operation projects in the Coal Industry for more than 20 years.

Our success in Asia through BMS/Contromation has ensured we have successfully executed projects with most major coal producers in Indonesia during this time

Our success in Australia through subsidiary Pasific Coal Technology with all projects deploying the PCT designed Baum JIG and Dense media processing modules, with installations still running following 20 years of operation.

  Coal Processing Plant (CPP) Modularized Design  
  The group design and manufacture a range of modular coal processing plants ranging in size from 100TPH to 1500TPH Single Modules, with combination of multiple modules to client specific requirements.  
Plant Key Features









Short Delivery (18-24 wks)
JIG/Cyclone Circuit Options
Dense Media Circuit Options
Reduced Manning requirements
Low Power Consumption
Low Capital costs
Low Operating costs
Low maintenance costs
High availability
Small real estate requirements
Principle engineer, David Johns, has mainteained a key role in wash plant advances in Australia with representations including the following;
 




Coal Preparation Society member since 1970 and
Secretary of the Coal Preparation Society 1984 through 1987
Vice Chairman of the Coal Preparation Society 1987 through 1989
Chairman of the Coal Preparation Society 1989 through 1991
Chairman of the Fifth Australian Coal Preparation Conference 1991
 
  Coal Training and Operations (Indonesia)  
The Group offer operations and maintenance contracts to clients who prefer to contract out these activities. The teams operate to ISO and NOSA international standards and guarantee clients a seamless hand-over from commissioning into production.
Most Projects involving Engineering, Procurement and Construction (EPC) of these facilities include requirement for training and operational assintance. Depending on the complexity of the plant and the skill level of the operational personnel determines the level and duration of this training and assistance.

For the Bontang Coal Project which we completed in 1999, this training/assistance went for almost 2 years. This started out whith expatriate personnel to oversee the operation and maintenance of the facility, then to having our Indonesian National Engineers for training and fault finding and then to our national supervisors to assist with the maintenance of the plant. We have carried out a number of expansions of this facility in the past 10 years and with each expansion training and operational assistance was provided. We also provide a call out service to this facility in case problems arise which the clients engineers are unable to solve. If the problem cannot be sorted out over the phone we despatch our engineers to site and can generally be on site within 24 hours. This service has been utilised by the client a number of times since the plant was first commissioned.

We also completed a project for Bukit Asam (Indonesian Coal Board) at Tanjun Enim which required our engineers to be on site for 12 months to train and maintenance on personnel.

In the past 7 years Coal Projects where we have provided training and operational assistance include the following;

 







Bontang Coal Project - PT Indominco Mandiri
Kelanis Coal Project - PT Adaro Indonesia (2nd Largest Coal Producer in Indonesia)
KPC sangatta - PT Kaltim Prima Coal (Largest Coal Producer in Indonesia)
PIK Coal Handling Facility - Bayan Group
KFT1 - Coal transshipment Vessel - ASLE
Binamitra Coal handling Facility - Adaro Group
North Pulu Laut Coal Terminal - PT Arutmin Indonesia
Balikpapan Coal Terminal - Bayan Group
 
  For many of the Coal Facilities listed above we have undertaken several projects all requiring different levels of training and operational assistance.  
  Coal Training and Operations (Australia/NZ/Vietnam)  
  Specific project experience with various roles employed as Project Management, Commissioning Manager, Operations Training of the folowing contracts;  
   
Coal Handling Plant (CHP) Design
The Group's Coal Handling Plant, Engineering Services provide for complete engineering development of Truck and Train unloading systems, through to Conveying, Stockpiling, Reclaiming and Marine Load-out systems.

With Affiliated Profesional Engineers, the Company provides a level of expertise and practical experience unusual for an Engineering firm.

We advocate at all times a clear line of communications at all levels of Management, Engineering and Administration. Commencing with the development of the project Risk Review Study, the team reviews all aspects of project scope, design codes and standards, as well designing for maintenance and operations safety.

We strongly support the client's involvement at project commencement, as well as the client's continued involvement throughout the project's execution
Project Management of Engineering Process
At the heart of any success story is a regimented approach to the structure of systems and the management of change.

To this end the company places great importance on keeping abreast with international standards and has ensured that the companies project management of design process is aligned with the Project Managemen Institutes (PMI), Project Management Base of Knowledges (PMBoK 4th edition).

The various process Knowledge area's have been embraced by company management who in turn have ensured that the companies systems are supplemented with learning tools, ensuring that the relevant knowledge area's are translated into "Self Help" documentation, which allows for employee at all levels, to access and learn, in an environment conducive to each indviduals
back to top
 
Home | Mission | Services | Projects | Alliances | Contact Us
© copyrights Contromation Energy Services