Detailing & Drafting |
|
| Project > Engineering / Material Handling / Feasibility Studies / Detailing & Drafting / Project Development
|
|
LAMPUNUT Coal Handling Facility
|
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
| Feasibility & Detail Design Coal Handling Facilities
BHP BILLITON International
Indonesia
Client Direct Award
US$ Confidential
2015
Detailed Design associated with a 2.5 MMTPA Coking Coal facility Deliverables included;
- Upgrade of Port Facilities
- Fuel Storage Facilities
- Coal Handling Facilities
- Diesel Power Station
- Mine Infrastructure
All carried out in accordance with BHPB standard Engineering practices, cognizant of Indonesian KEPMEN 555 Mining regulations
|
|
|
|
| Project > Engineering / Material Handling / Feasibility Studies / Detailing & Drafting / Project Development
|
|
HAJU Coal Handling Facility
|
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
| Feasibility & Detail Design Coal Handling Facilities
BHP BILLITON International
Indonesia
Client Direct Award
US$ Confidential
2013
Detailed Design associated with a 1 MMTPA Coking Coal facility Deliverables included;
- Barge Loading Wharfs
- Fuel Storage Facilities
- Coal Handling Facilities
- Diesel Power Stations
- Infrastructure Facilities
All carried out in accordance with BHPB fatal risk protocols, Standard Engineering Practices and HSEC requirements.
|
|
|
|
| Project > Engineering / Material Handling / Feasibility Studies / Detailing & Drafting / Project Development
| |
Maruwai Stage 1 - Coal Handling Facility |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Feasibility & Design Study, Coal Handling & Port facilities
BHP BILLITON
Indonesia
Client Direct Award
N/A
US$ Confidential
2007 - 2008
Feasibility Study associated with a 3 MMTPA Coking Coal facility including;
- 2 Barge Loading Wharfs
- 2 Barge Unloading Wharfs
- 1 Fuel Unloading Wharf
- 2 MLtrs Fuel Storage Facilities
- 2 Coal Handling Facilities
- Drawing Format to Microstation DGN Conform all carried in accordance with BHPP fatal risk protocol, Standard Engineering Practices and HSEC requirements.
|
|
|
|
| Project > Engineering / Material Handling / Marine / Electrical Installation / Detailing & Drafting
| |
F.C. Daniel |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Wash Plant & Coal Handling - Capital Estimate Review
BHP BILLITON International
Indonesia
Client Direct Award
N/A
US$ Confidential
2007
Capital cost estimate review associated with a 450tph Dense Medium preparation plant including :
- Coal Handling System
- Fine ore modules
- Coarse ore module
- Thickener circuit
- Tailing belt press circuit
|
|
|
|
| Project > Material Handling / Detailing & Drafting / Processing Plants
| |
Kansanshi Gold Plant |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| EPC Gold Processing
First Quantum Minerals
Zambia - Africa
Client Direct Award
N/A
US$ 45,000,000
2006 - 2007
Design of Civil work for the Kansanshi CIP Gold Plant with scope including:
- Tank area
- Reagent area
- Gold room & Elution area
The Above included for a 3D model with production of bending schedules. Structure fabrication executed in Indonesia with export to Zambia.
|
|
|
|
| Project > Engineering / Material Handling / Feasibility Studies / Electrical Installation / Detailing & Drafting
| |
HAJU Coal Handling Facility |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Feasibility & Detail Design Coal Handling Facilities
BHP BILLITON International
Indonesia
Client Direct Award
N/A
US$ Confidential
2007
Feasibility Study & Detailed Design associated with a 1 MMTPA Coking Coal facility Deliverables included;
- 2 Barge Loading Wharfs
- 1 Barge Unloading Wharf
- 2 Fuel Storage Facilities
- 2 Coal Handling Facilities
- 2 Diesel Power Stations
- 2 Camp & Infrastructure Facilities
All carried out in accordance with BHPB fatal risk protocols, Standard Engineering Practices and HSEC requirements.
|
|
|
|
| Project > Electrical Installation / Detailing & Drafting / Marine / Oil & Gas
| |
Jack-up Services Rig |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Detail Engineering E&I Offshores Services
Global Process Services
Malaysia
Aerogate bhd.
N/A
US$ 880,000
2006 - 2007
Upgrade of Jack-up services rig with Engineering deliverables requiring class certification of the following systems :
- Rig Power Distribution System
- Rig Lightning & General Power Systems
- Rig Emergency Lightning Systems
- Modelling of Infrastructure & Services
|
|
|
|
| Project > Engineering / Detailing & Drafting / Material Handling
| |
KOGAN CREEK |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| 750MW Power Station Coal Handling Station
Roberts & Schaefer
Queensland / Australia
Siemens
N/A
US$ 60,000,000
2005-2006
Provision of Engineering, Fabrication and Logistic management services associated with the 1000 tph coal feed system. Document control and co ordination via America, Australia, Indonesia and Germany, through our web based QDMS system. Export to Australia of 1300 tonnes, ready for erection.
|
|
|
|
| Project > Detailing & Drafting / Material Handling
| |
Rapid Growing Project Stacker / Reclaimer Machines Contract |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Drawing Services Material Handling
BHP BILLITON
Western Australia
Krupp Australia
N/A
US$ 20,000
2006
Provision of drawing services to ensure conformance to BHP Billiton Standards. Drawings converted to Micro station and processed through DGN Conform, all carried in accordance with BHPB standard engineering practices.
|
|
|
|
| Project > Engineering / Electrical Installation / Detailing / Material Handling / Project Development | |
Kaltim Prima Coal 12 MTPA Coal Handling Facility |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| EPC Coal Handling Systems
Bumi Resources
Indonesia
J/O Roberta & Schaefer USA
N/A
US$ 22,000,000
2004 - 2005
Turnkey EPC associated with new Dump Station, Primary and Secondary crushing, Stockpiling and Automated reclaim blending, interfacing with the existing 13 KM overland conveyor to the port side
|
|
|
|
| Project > Control System / Detailing & Drafting / Engineering / Material Handling / Processing Plants / Wash Plants
| |
Adaro Coal - Coal Processing Plant |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Engineering & Construction Coal Processing Plant
ADARO
Indonesia
MBSS (Boot Contract)
N/A
US$ 12,000,000.00
2009 - 2010
Design, fabrication and erection of a 400tph Jig Coal Processing Plant including :
- Development of Wash Data
- Development of Plant Balance
- Ash curve Simulation
- Design of Material Handling System
- Design of Power House
- Erection of Plant
- Commissioning of plant
|
|
|
|
| Project > Control System / Detailing & Drafting / Material Handling / Processing Plants / Wash Plants
| |
Hebburn Mine Rehab. Project |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Design Drafting Services Coal Processing Plants
Hunter Enviro Mining
New South Wales
Pasific Coal Technology
N/A
AUD$ 9,500,000.00
2005
This project involved the rehabilitation of the former old collery. Coal is extracted from the former tailings site and processed for sale. Funds from the sale are then used for the rehabilitation of the site This 250tph plant was completed on a design, contract management and commissioning basis. It comprises a Baum jig and cyclones, closed circuit effluent system. The entire operation is highly automated and is centrally controlled by a P.L.C. system.
|
|
|
|
| Project > Control System / Detailing & Drafting / Material Handling / Processing Plants / Wash Plants
| |
Muswellbrook Coal |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Design Drafting Services Coal Processing Plant
Muswellbrook Coal Co.Ltd
New South Wales
BMCH
N/A
AUD$ 8,500,000.00
1986
This 300tph plant was completed for Muswellbrook Coal Co. Ltd on a design, contract management and commissioning basis. If comprises a Baum jig and a closed circuit effluent system. The entire operation is highly automated and is centrally controlled by a P.L.C. system. The Muswellbrook plant is designed to treat the higher ash coal diverted by the auto ash analyzer as being unsuitable for supply in an unwashed form.
|
|
|
|
| Project > Detailing & Drafting / Material Handling / Processing Plants / Wash Plants
| |
Beizhouzhuang Coal |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Design Drafting Services Coal Processing Plant
Australian Coal Technologies
China
Australian Coal Technologies
N/A
AUD$ 9,500,000.00
2002
This project involved design drafting of the material handling systems and equipment selections. This 7000tph plant was completed on a design, contract management and commissioning basis. It comprises a Dense Media process. The entire operation is highly automated and is centrally controlled by a P.L.C. system.
|
|
|
|
| Project > Detailing & Drafting / Material Handling / Processing Plants / Wash Plants
| |
Rotowaro Coal |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Design Drafting Services Coal Processing Plant
Coal Corp.
New Zealand
BMCH
N/A
AUD$ 6,500,000.00
1986
This 100tph re-locatable plant was completed for New Zealand States Coal Mines now Coal Corp. On a design, contract management and commissioning basis. It comprises a Baum jig and lines treatment plant. The entire operation is highly automated and is centrally controlled by a P.L.C system. The Rotowaro plant is designed to crush, clean and screen coal which was previously dumped as un-saleable coal. The main feature of the plant is that it can be relocated to any of the Coal Corp mines sites. Relocation is expected to take of the order of 8 days.
|
|
|
back to top
|
|