banner-project
banner-bwh
Our Projects :

visual


















Feasibility Studies

Project > Engineering / Material Handling / Feasibility Studies / Detailing & Drafting / Project Development
LAMPUNUT Coal Handling Facility
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
Feasibility & Detail Design Coal Handling Facilities
BHP BILLITON International
Indonesia
Client Direct Award
US$ Confidential
2015
Detailed Design associated with a 2.5 MMTPA Coking Coal facility Deliverables included;
- Upgrade of Port Facilities
- Fuel Storage Facilities
- Coal Handling Facilities
- Diesel Power Station
- Mine Infrastructure
All carried out in accordance with BHPB standard Engineering practices, cognizant of Indonesian KEPMEN 555 Mining regulations
Project > Engineering / Risk Management / Feasibility Studies / Project Development / Material Handling / Processing Plants
RUNRUNO GOLD / MOLY PROJECT
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
Green Field
FCF Mineral plc.
Northern Phillipines
FCF Mineral plc.
US$ 6,500,000
2014 / 2015
Detailed design of a 1.8 Mtpa Crushing / Milling / Gravity / Floatation / CIL / BIOX Process facility and associated Infrastructure. Project services also included for required Risk Management and Constructibility reviews, as well as onsite commissioning and start up.
Project > Engineering / EPC / Material Handling / Electrical Installation / Control System / Feasibility Studies / Project Development / Processing Plants
KAPULLO COPPER PROJECT
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
Green Field
Mawson West
Congo Afrika
N/A
US$ 12,600,000
2014 / 2015
CAPEX, OPEX and Detailed design of the Process Plant, via primary jaw crusher, a secondary cone crusher, ball milling and conventional rougher / cleaner flotation and filtration. Additional Project services included for EPCM support services within an integrated Owner team, as well as subcontract award of the EPC of both E&I and Piping subcontracts.
Project > Engineering / Material Handling / Feasibility Studies / Detailing & Drafting / Project Development
HAJU Coal Handling Facility
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
Feasibility & Detail Design Coal Handling Facilities
BHP BILLITON International
Indonesia
Client Direct Award
US$ Confidential
2013
Detailed Design associated with a 1 MMTPA Coking Coal facility Deliverables included;
- Barge Loading Wharfs
- Fuel Storage Facilities
- Coal Handling Facilities
- Diesel Power Stations
- Infrastructure Facilities
All carried out in accordance with BHPB fatal risk protocols, Standard Engineering Practices and HSEC requirements.
Project > Feasibility Studies / Processing Plants / EPCM / Risk Management / Project Development
SIHAYO GOLD PROJECT
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
Green Field
Sihayo Gold
Central Sumatra, Indonesia
N/A
US$ 2,800,000
2011 / 2012
CAPEX, OPEX and Feasibility design of a 1.5 Mtpa CIL Process Plant and associated Infrastructure. This also included for co-ordination of Client consultants responsible for Mine development as well as Bio mass Power Station and access roads.
Project > Engineering / Material Handling / Feasibility Studies / Detailing & Drafting / Project Development
Maruwai Stage 1 - Coal Handling Facility
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
:
Feasibility & Design Study, Coal Handling & Port facilities
BHP BILLITON
Indonesia
Client Direct Award
N/A
US$ Confidential
2007 - 2008
Feasibility Study associated with a 3 MMTPA Coking Coal facility including;
- 2 Barge Loading Wharfs
- 2 Barge Unloading Wharfs
- 1 Fuel Unloading Wharf
- 2 MLtrs Fuel Storage Facilities
- 2 Coal Handling Facilities
- Drawing Format to Microstation DGN Conform all carried in accordance with BHPP fatal risk protocol, Standard Engineering Practices and HSEC requirements.
Project > Feasibility Studies / Material Handling / Wash Plants / Project Development
Maruwai Stage 1 - CPP
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
:
Wash Plant & Coal Handling - Capital Estimate Review
BHP BILLITON International
Indonesia
Client Direct Award
N/A
US$ Confidential
2007
Capital cost estimate review associated with a 450tph Dense Medium preparation plant including :
- Coal Handling System
- Fine ore modules
- Coarse ore module
- Thickener circuit
- Tailing belt press circuit
Project > Engineering / Material Handling / Feasibility Studies / Detailing & Drafting / Project Development
HAJU Coal Handling Facility
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
:
Feasibility & Detail Design Coal Handling Facilities
BHP BILLITON International
Indonesia
Client Direct Award
N/A
US$ Confidential
2007
Feasibility Study & Detailed Design associated with a 1 MMTPA Coking Coal facility Deliverables included;
- 2 Barge Loading Wharfs
- 1 Barge Unloading Wharf
- 2 Fuel Storage Facilities
- 2 Coal Handling Facilities
- 2 Diesel Power Stations
- 2 Camp & Infrastructure Facilities
All carried out in accordance with BHPB fatal risk protocols, Standard Engineering Practices and HSEC requirements.
Project > Feasibility Studies / Project Development
Kaltim Prima Coal - Lubuk Tutung 3MMTPA Coal Handling Facility
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
:
Coal Handling Terminal Concept Study
Bumi Resources
Kalimantan - Indonesia
J/O Roberts & Schaefer USA
N/A
US$ 25,000,000
2004
Provision of concept design associated with a coal handling and barge load out facility. Concepts were then used to prepare cost estimates as well the basis of an EPC tender process. The successful contractor was then responsible for detail and erection of the facility.
Project > Feasibility Studies / Material Handling / Processing Plants / Wash Plants
Gunung Bayan Coal - Coal Processing Plant
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
:
Feasibility & Design Study Coal Processing Plant
Bayan Resources
Indonesia
Client Direct Award
N/A
US$ 185,000.00
2008 - 2009
Audit Study associated with a 150 tph dense Media Wash wheel Coal processing plant, to determine why plant balance was producing higher ash coal than specified. Audit determined several areas of process whereby mechanical items of equipment required overhaul & replacement, to ensure high ash content was removed form the fines circuit.
Project > Feasibility Studies / Wash Plants / Processing Plants / Material Handling
SEKAKO COAL - Coal Processing Plant
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
:
Feasibility & Design Study Coal Processing Plant
SMM
Indonesia
Client Direct Award
N/A
US$ 15,000,000.00
2008 - 2009
Feasibility Study associated with a 5 MMTPA Coking Coal Processing Plant including;
- Development of Wash Data
- Development of Plant Balance
- Ash Curve Simulation
- Evaluation of Dense Media & Cyclone Process
- Evaluation of Jig Side Air Process
- Evaluation of Jig Under Air Process
The study was the basis of a Capital cost estimate ensuring a single go forward option

back to top
Home | Mission | Services | Projects | Society | Contact Us
© copyrights Contromation Energy Services