RUNRUNO GOLD / MOLY PROJECT
|
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
| Green Field
FCF Mineral plc.
Northern Phillipines
FCF Mineral plc.
US$ 6,500,000
2014 / 2015
Detailed design of a 1.8 Mtpa Crushing / Milling / Gravity / Floatation / CIL / BIOX Process facility and associated Infrastructure. Project services also included for required Risk Management and Constructibility reviews, as well as onsite commissioning and start up.
|
|
|
|
| Project > Engineering / EPC / Material Handling / Electrical Installation / Control System / Feasibility Studies / Project Development / Processing Plants
|
|
KAPULLO COPPER PROJECT
|
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
| Green Field
Mawson West
Congo Afrika
N/A
US$ 12,600,000
2014 / 2015
CAPEX, OPEX and Detailed design of the Process Plant, via primary jaw crusher, a secondary cone crusher, ball milling and conventional rougher / cleaner flotation and filtration. Additional Project services included for EPCM support services within an integrated Owner team, as well as subcontract award of the EPC of both E&I and Piping subcontracts.
|
|
|
|
| Project > Engineering / Material Handling / Feasibility Studies / Detailing & Drafting / Project Development
|
|
LAMPUNUT Coal Handling Facility
|
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
| Feasibility & Detail Design Coal Handling Facilities
BHP BILLITON International
Indonesia
Client Direct Award
US$ Confidential
2015
Detailed Design associated with a 2.5 MMTPA Coking Coal facility Deliverables included;
- Upgrade of Port Facilities
- Fuel Storage Facilities
- Coal Handling Facilities
- Diesel Power Station
- Mine Infrastructure
All carried out in accordance with BHPB standard Engineering practices, cognizant of Indonesian KEPMEN 555 Mining regulations
|
|
|
|
| Project > Engineering / Material Handling / Processing Plants / Detailing & Drafting / Project Development
|
|
AGC FLOAT GLASS BATCH PLANT
|
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
| Detailed Design of Float Glass Batch Plant
AGC Chemicals
Cikampek, West Java, Indonesia
EME Germany
US$ 190,000
2015
Design of a 700 tpd Float Glass Batch Plant under subcontract to the German Company EME. The Scope of work requires the design in a BIM based 3D model, producing all required engineerng and shop detailing of structural steel and Silos. This project is still current with a completion date in July 2016.
|
|
|
|
| Project > Engineering / Material Handling / Feasibility Studies / Detailing & Drafting / Project Development
|
|
HAJU Coal Handling Facility
|
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
| Feasibility & Detail Design Coal Handling Facilities
BHP BILLITON International
Indonesia
Client Direct Award
US$ Confidential
2013
Detailed Design associated with a 1 MMTPA Coking Coal facility Deliverables included;
- Barge Loading Wharfs
- Fuel Storage Facilities
- Coal Handling Facilities
- Diesel Power Stations
- Infrastructure Facilities
All carried out in accordance with BHPB fatal risk protocols, Standard Engineering Practices and HSEC requirements.
|
|
|
|
| Project > Engineering / Material Handling / Processing Plants / Wash Plants / Electrical Installation
|
|
Newlands Coal
|
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
| Coal Preparation Plant
Newlands Coal
Queensland Australia
ACT Australia
US$ 3,500,000
1998
Design of a 1100 tph combined Thermal and Coking CHPP Facility under subcontract to Australian Coal Technologies.
The Scope of work required building the design in a BIM based 3D model, producing all required shop detailing with co-ordination of fabrication processes.
This project is still under operation having been purchased by Xstrata Australia.
|
|
|
|
|
| Project > Engineering
|
|
NEWCASTLE COAL TERMINAL |
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
| Green Field
Newcastle Coal Terminal (NCIG)
Kooragang Island. Australia
Thiess Australia
US$ 1,200,000
2008
Execution of Detail Engineering of Train Unloading, Stacker/Stockpile and Ship Loading Material Handling systems.
|
|
|
|
| Project > Engineering / Risk Management / Processing Plants
| |
RUNRUNO GOLD / MOLY PROJECT |
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
: | Green Field
FCF Minerals plc.
Northern Phillipines
Leightons Phillipines
US$ 2,000,000
2012 / 2013
Feasibility design of a 1.8 Mtpa Floatation / CIL / BIOX Process facilties and associated Infrastructure. Project services also included for required Risk Management and Constructibility reviews.
|
| |
|
|
| Project > Engineering / Risk Management / Material Handling / Marine
| |
BENGALON COAL TERMINAL |
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
| Brown Field
Kaltim Prima Coal
East Kalimantan, Indonesia
N/A
US$ 1,300,000
2011 / 2012
Detailed design of a 9 Mtpa Coal Handling Port upgrade project, inclusive of Coal inloading as well as coal reclaiming systems. Services also included for required Risk Management workshop and Constructability reviews mass Power Station and access roads, through to operational start-up and ongoing training assistance.
|
| |
|
| Project > Commercial / Engineering
| |
Allianz Stuggart
|
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Engineering Drafting Services
Conrad & kaschner
Frankfurt, Germany
Hentrich Petschnigg & Partner KG
N/A
US$ 52,000.00
1999
Design Layouts associated with Building Piping , Air-conditioning, and Heating
Services. Documentation between Germany and Jakarta was carried out over
FTP site
|
|
|
|
| Project > Control system / Fibre Optic / Material Handling / Engineering / Electrical Installation
| |
| Coal Terminal & Ship Load out Facility |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Control System Installation
PT. Arutmin Indonesia
North Pulu Laut, Kalimantan
Client Direct Award
Turnkey, Engineering, Procurement
US$ 360,000.00
2003 - 2004
N/A
|
|
|
| Automation of Coal Terminal Operations associated with in load (Stacker), out load (Reclaimer) and Ship loading, inclusive of automatic startup and load sharing of Power House generators. In addition the system includes Head Office remote monitoring and control via WAN and Satellite network.
|
| |
|
| Project > Engineering / Electrical Installation / Fibre Optic / Marine / Material Handling
| |
| Indominco Mandiri 8 MTPA Coal Handling and Port Load out
|
| Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| EPC Electrical & Instrument
Sandwell Canada
Indonesia
Thiess Contractors Indonesia
N/A
US$ 4,620,000
1999
Turnkey Engineering, Procurement and Construction of Electrical & Instrument Systems comprising; 4 Mw Gas Turbine Power Station HMI Control System Instrumentation Calibration & Certification Gas & Fire Detection Emergency Shut Down system High Voltage Reticulation
|
|
|
|
| Project > Engineering / Material Handling / Feasibility Studies / Detailing & Drafting / Project Development
| |
Maruwai Stage 1 - Coal Handling Facility |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Feasibility & Design Study, Coal Handling & Port facilities
BHP BILLITON
Indonesia
Client Direct Award
N/A
US$ Confidential
2007 - 2008
Feasibility Study associated with a 3 MMTPA Coking Coal facility including;
- 2 Barge Loading Wharfs
- 2 Barge Unloading Wharfs
- 1 Fuel Unloading Wharf
- 2 MLtrs Fuel Storage Facilities
- 2 Coal Handling Facilities
- Drawing Format to Microstation DGN Conform all carried in accordance with BHPP fatal risk protocol, Standard Engineering Practices and HSEC requirements.
|
|
|
|
| Project > Engineering / Material Handling / Marine / Electrical Installation / Detailing & Drafting
| |
F.C. Daniel |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Wash Plant & Coal Handling - Capital Estimate Review
BHP BILLITON International
Indonesia
Client Direct Award
N/A
US$ Confidential
2007
Capital cost estimate review associated with a 450tph Dense Medium preparation plant including :
- Coal Handling System
- Fine ore modules
- Coarse ore module
- Thickener circuit
- Tailing belt press circuit
|
|
|
|
| Project > Engineering / Material Handling / Feasibility Studies / Detailing & Drafting / Project Development
| |
HAJU Coal Handling Facility |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Feasibility & Detail Design Coal Handling Facilities
BHP BILLITON International
Indonesia
Client Direct Award
N/A
US$ Confidential
2007
Feasibility Study & Detailed Design associated with a 1 MMTPA Coking Coal facility Deliverables included;
- 2 Barge Loading Wharfs
- 1 Barge Unloading Wharf
- 2 Fuel Storage Facilities
- 2 Coal Handling Facilities
- 2 Diesel Power Stations
- 2 Camp & Infrastructure Facilities
All carried out in accordance with BHPB fatal risk protocols, Standard Engineering Practices and HSEC requirements.
|
|
|
|
| Project > Engineering / Electrical Installation / Material Handling
| |
PIK - Coal Handling Facility |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| EPC Coal Handling Facilities
PT. Perkasa Inakakerta (Bayan Group)
Kalimantan - Indonesia
Client Direct Award
N/A
US$ 880,000
2006-2007
Design, supply, installation and commisioning of the complete Electrical works for PIK Coal Handling Facility. Facility included Crushing 1.6KM overland/water conveyor, barge loader, reclaiming and power generation.
|
|
|
|
| Project > Engineering / Detailing & Drafting / Material Handling
| |
KOGAN CREEK |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| 750MW Power Station Coal Handling Station
Roberts & Schaefer
Queensland / Australia
Siemens
N/A
US$ 60,000,000
2005-2006
Provision of Engineering, Fabrication and Logistic management services associated with the 1000 tph coal feed system. Document control and co ordination via America, Australia, Indonesia and Germany, through our web based QDMS system. Export to Australia of 1300 tonnes, ready for erection.
|
|
|
|
| Project > Control System / Engineering / Electrical Installation / Marine / Material Handling
| |
KFT 1 - HULL388 |
Field of Activity
Client
Site Location
Main contractor
Respobilites
Contract Value
Contract Year
Scope of works
| :
:
:
:
:
:
:
:
| Control System Integration Coal Handling
PT. Arutmin Indonesia
North Pulu Laut, Kalimantan
Client Direct Award
Turnkey, Engineering, Procurement & Construction
US$ 360,000
2003 - 2004
N/A
|
|
|
| Transshipment of coal from Barges to CAPE size Vessels, via on board conveyor system without load achieved via wireless controlled ship loader. All certification to Class requirement, with stockpile capacity of 65,000 tonnes, capable of producing a homogeneous blend via proportional control of 3 stockpile drag chain feeders. Alternatively the in load system is capable of direct feed to the ship loader via an in load system consisting4 Grab Cranes, each with 32 tonne capacity, with blending from in load hoppers and proportionally controlled belt feeders.
|
| |
|
| Project > Engineering / Electrical Installation / Detailing / Material Handling / Project Development
| |
Kaltim Prima Coal 12 MTPA Coal Handling Facility |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| EPC Coal Handling Systems
Bumi Resources
Indonesia
J/O Roberta & Schaefer USA
N/A
US$ 22,000,000
2004 - 2005
Turnkey EPC associated with new Dump Station, Primary and Secondary crushing, Stockpiling and Automated reclaim blending, interfacing with the existing 13 KM overland conveyor to the port side
|
|
|
|
| Project > Electrical Installation / Engineering / Material Handling / Project Development
| |
Binamitra Coal Handling Facility |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| EPC Coal Handling Systems
PT. Adaro Indonesia
Kalimantan - Indonesia
Client Direct Award
Turnkey, Engineering, Procurement & Construction
US$ 3,600,000
2003 - 2004
N/A
|
|
|
| Engineering procurement and construction of a 3MMTPA coal handling facility located in remote Kalimantan.
System included for the following :
- Power Generation & Distribution
- General light and power
- Conveyor System and Barge Load Out
|
| |
|
| Project > Control System / Electrical Installation / Engineering / Processing Plants
| |
Kansanshi Gold Plant - Control System Integration |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Control System Integration
First Quantum Minerals
Zambia - Africa
FQM
N/A
US$ 350,000
2006 - 2007
Design of Electrical, Instrumentation and Control System for the Kansanshi CIP Gold Plant with scope including :
- Programming Siemens S7 PLC
- Configuration of Citect HMI
- Containerized M.C.C / Control Room
All above provided ex Indonesia, including logistic support.
|
|
|
|
| Project > Electrical Installation / Engineering / Heat Tracing / Oil & Gas
| |
Suban II Gas Gathering Station |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Electric Heating Technology
Conoco Philips
Jambi - Indonesia
Thiess Contractors Indonesia
Engineering, Procurement & Installation Supervision
US$ 54,000.00
2006
Heat Trace Design
Provision of design, procurement and Installation supervision of lines to prevent condensation of flare gas, all in accordance with required HAZOP.
|
|
|
|
| Project > Control System / Engineering / Maintenance / Processing Plants
| |
Kiln & Burner Upgrades |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| EPC Control System Upgrade
INCO
Soarako, Sulawesi - Indonesia
Client Direct Award
N/A
US$ 280,000.00
2002-2003
Design, programming, development and on site commisioning of HMI and PLC system for kiln and Burner upgrade works. System included Rockwell PLC 5, RS View HMI, with interface with radio systems mounted on Kilns.
Maintenance services included the provision of 2 control system engineers to assist ongoing operations.
|
|
|
|
| Project > Control System / Electrical Installation / Engineering
| |
Gosowong Gold Mine - Control System Integration |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Control System Integration Gold Processing
Newcrest - PT Nusa Halmahera
North Sulawesi - Indonesia
NHM - Newcrest Australia
N/A
US$ 750,000
2003
Carry out value improvement process with implementation of design, installation and commisioning of the following:
- Plant wide PLC / Citect Control System
- SAG Mill VSD
- De Bottle necking
|
| |
|
| Project > Electrical Installation / Engineering / Oil & Gas / Power Generation
| |
Field Generator Power Distribution |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| EPC Power Generation & Services
KUFPEC
Seram Island
Client Direct Award
Turnkey, Engineering, Procurement & Construction
US$ 55,000.00
2003
N/A
|
| |
| Provision of Skid Mounted Generators for field Well Head Power distribution, including installation, testing, communissioning and maintenance services.
|
| |
|
| Project > Control System / Engineering / Marine
| |
King Ship 1 & 2 |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| EPC Control System Integration
King Ship
Guandong - China
Radio Holland
Turnkey, Engineering & Commisioning
US$ 15,000.00
2003-2004
Development of Onboard control system interfacing generators and Bridge system, inclusive of documentation and commisioning deliverables.
|
|
|
|
| Project > Electrical Installation / Engineering / Heat Tracing / Oil & Gas
| |
Central Processing Platform No. 3 |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Electric Heating Technology
VSP / Petechim
Vietnam
Keppel FELS & TOEPL (Technics Offshore Engineering)
N/A
460,000 EUR
2002
N/A
|
|
|
|
| Project > Electrical Installation / Engineering / Heat Tracing / Oil & Gas
| |
FPSO " Sea Eagle" |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| BEH Electrical Heat Trace
Shell Petroleum Development Company
Nigeria
Halliburton West Africa Limited
N/A
US$ 1,560,000.00
2002
Skid Heat Trace Design & Installation
|
| |
| Vessel Specification : Designed to separate produced oil, water and gas, compress produced gas and treat produced water, the topside facilities can accomodate a total of 170,000 barrels of well fluids and 100 million standard cubic feet of gas per day. The vessel hull has an oil storage capacity of 1.4 million barrels.
|
| |
|
| Project > Control System / Electrical Installation / Engineering / Oil & Gas
| |
Sand Pan Filtration - CGS 1,3 & 4 |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Control System Installation
Caltex International
Duri, Sumatra - Indonesia
Thiess Contractors Indonesia
N/A
US$ 2,200,000.00
2001 - 2002
N/A
|
|
|
| Provision of Electrical and Instrument Systems for the Sand Pan Filtration and Flushing systems, associated with Caltex Central Gathering Stations 1,2,3 & 4. Complete HAZOP review of process design and development, programming, installation, commisioning of the facilities HMI based control and ESD systems, as well as Training of Caltex operation personnel.
|
| |
|
| Project > Electrical Installation / Engineering / Heat Tracing / Oil & Gas
| |
FPSO "Panyu" |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| BEH Electrical Heat Trace
CNOOC
N/A
CONHW
N/A
US$ 36,000.00
2002
Skid Heat trace design & Installation
|
|
|
| Vessel Specification : The FPSO vessel is a new build 160 000 DWT vessel and will be moored in a passive mode. Mooring and vessel are designed to withstand the 100-year typhoon of 13.1 m significant wave height and wind speeds up 200km/h.
|
| |
|
| Project > Electrical Installation / Engineering / Heat Tracing / Oil & Gas
| |
FPSO "Companion / Anasuria" |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Essential Power Distribution
Shell Petroleum Development Company
Nigeria
Halliburton West Africa Limited
N/A
US$ 156,000.00
2002
Design and supply of essential desitribution boards & Transformers to class requirements.
|
|
|
| Designed to separate produced oil, water and gas, compress produced gas and treat produced water, the topside facilities can accomodate a total of 170,000 barrels of well fluids and 100 million standard cubic feet of gas per day. The vessel hull has an oil storage capacity of 1.4 million barrels.
|
| |
|
| Project > Control System / Electrical Installation / Engineering / Instrumentation / Oil & Gas
| |
Pangkalan Brandan Gas Recovery, Storage and Loadout facility |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| EPC Electrical & Instrument
Pertamina Indonesia
Indonesia
Linde / Thiess Contractors Indonesia
N/A
US$ 3,900,000
1996
Turnkey Engineering, Procurement and Construction of Electrical & Instrument system comprising :
- 4 Mw Gas Turbine Power Station
- HMI Control System
- Instrumentation Calibration & Certification
- Gas & Fire detection
- Emergency Shut down system
- High Voltage Reticulation
|
|
|
|
| Project > Electrical Installation / Engineering / Heat Tracing / Oil & Gas
| |
Kerteh Centralised Tankage Facility 2 |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Electric Heating Technology
Dialog E & C
Kerteh, Malaysia
Mikuni (M) Sdn Bhd, Best Wide Matric & Bartec Pte Ltd
N/A
312.000 EUR
2000 - 2001
Design, Engineering, Supply Installation, Testing, Commisioning and Documentation.
|
|
|
|
| Project > Control System / Detailing & Drafting / Engineering / Material Handling / Processing Plants /
Wash Plants
| |
Adaro Coal - Coal Processing Plant |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Engineering & Construction Coal Processing Plant
ADARO
Indonesia
MBSS (Boot Contract)
N/A
US$ 12,000,000.00
2009 - 2010
Design, fabrication and erection of a 400tph Jig Coal Processing Plant including :
- Development of Wash Data
- Development of Plant Balance
- Ash curve Simulation
- Design of Material Handling System
- Design of Power House
- Erection of Plant
- Commissioning of plant
|
|
|
|