RUNRUNO GOLD / MOLY PROJECT
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
Green Field
FCF Mineral plc.
Northern Phillipines
FCF Mineral plc.
US$ 6,500,000
2014 / 2015
Detailed design of a 1.8 Mtpa Crushing / Milling / Gravity / Floatation / CIL / BIOX Process facility and associated Infrastructure. Project services also included for required Risk Management and Constructibility reviews, as well as onsite commissioning and start up.
Project > Engineering / EPC / Material Handling / Electrical Installation / Control System / Feasibility Studies / Project Development / Processing Plants
KAPULLO COPPER PROJECT
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
Green Field
Mawson West
Congo Afrika
N/A
US$ 12,600,000
2014 / 2015
CAPEX, OPEX and Detailed design of the Process Plant, via primary jaw crusher, a secondary cone crusher, ball milling and conventional rougher / cleaner flotation and filtration. Additional Project services included for EPCM support services within an integrated Owner team, as well as subcontract award of the EPC of both E&I and Piping subcontracts.
Project >EPCM / Risk Management / Processing Plants
SUMATRA COPPER GOLD PROJECT
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
Brown Field
SUMATRA COPPER GOLD plc
South Sumatra, Indonesia
N/A
US$ 7,500,000
2014 / 2015
CAPEX, OPEX and Detailed design of a 400,000 tpa CIL Process Plant, with consideration for 900,000 tpa upgrade and associated Infrastructure. Additional Project services included for EPCM support services within an integrated Owner team, as well as subcontract award of the EPC of both E&I and Piping subcontracts.

Project > EPC / Processing Plants
TUJUH BUKIT GOLD PROJECT
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
Green Field
PT Bumi Success Indo
East Java, Indonesia
N/A
US$ 1,400,000
2014 / 2015
CAPEX, OPEX and Feasibiltiy Engineering development of a 4 Mmtpa Heap Leach facility, inclusive of Crushing Agglomeration, Solution management and ADR plant for production through to Dore.

Project > Engineering / Material Handling / Processing Plants / Detailing & Drafting / Project Development
AGC FLOAT GLASS BATCH PLANT
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
Detailed Design of Float Glass Batch Plant
AGC Chemicals
Cikampek, West Java, Indonesia
EME Germany
US$ 190,000
2015
Design of a 700 tpd Float Glass Batch Plant under subcontract to the German Company EME. The Scope of work requires the design in a BIM based 3D model, producing all required engineerng and shop detailing of structural steel and Silos. This project is still current with a completion date in July 2016.

Project > EPCM / Risk Management / Processing Plants
SUMATRA COPPER GOLD PROJECT
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
Brown Field
SUMATRA COPPER GOLD plc
South Sumatra, Indonesia
N/A
US$ 3,800,000
2012
Feasibility and Detailed design of a 200,000 - 400,000 tpa CIL Process Plant and associated Infrastructure. Project services also included for required Risk Management and Constructibility reviews
Project > Engineering / Material Handling / Processing Plants / Wash Plants / Electrical Installation
Newlands Coal
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
Coal Preparation Plant
Newlands Coal
Queensland Australia
ACT Australia
US$ 3,500,000
1998
Design of a 1100 tph combined Thermal and Coking CHPP Facility under subcontract to Australian Coal Technologies. The Scope of work required building the design in a BIM based 3D model, producing all required shop detailing with co-ordination of fabrication processes. This project is still under operation having been purchased by Xstrata Australia.
Project > Engineering / Risk Management / Processing Plants
RUNRUNO GOLD / MOLY PROJECT
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
Green Field
FCF Minerals plc.
Northern Phillipines
Leightons Phillipines
US$ 2,000,000
2012 / 2013
Feasibility design of a 1.8 Mtpa Floatation / CIL / BIOX Process facilties and associated Infrastructure. Project services also included for required Risk Management and Constructibility reviews
Project > Feasibility Studies / Processing Plants / EPCM / Risk Management / Project Development
SIHAYO GOLD PROJECT
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
Green Field
Sihayo Gold
Central Sumatra, Indonesia
N/A
US$ 2,800,000
2011 / 2012
CAPEX, OPEX and Feasibility design of a 1.5 Mtpa CIL Process Plant and associated Infrastructure. This also included for co-ordination of Client consultants responsible for Mine development as well as Bio mass Power Station and access roads.
Project > EPC / Processing Plants
KASONGAN GOLD PROJECT
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
Brown Field
PT Kasongan Bumi Kencana
Central Kalimantan, Indonesia
N/A
US$ 2,200,000
2012
Execution of Engineering and Construction of a 700,000 tpa CIL Process Plant. This facility was previously erected to 90%, yet never completed due to the Asian Economic crisis
.
Project > EPC / EPCM / Risk Management / Processing Plants
SIANA GOLD PROJECT
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
:
Green Field
Green Stone Resources
North Mindanao, Philippines
N/A
US$ 2,900,000
2011 / 2012

Detailed Engineering and Risk management Services associated with a 1.0 Mtpa CIL Process Plant and associated Infrastructure. This also included for onsite commissioning activites through to operational start-up and ongoing training assistance. workshop and Constructability reviewsmass Power Station and access roads.through to operational start-up and ongoing training assistance.
Project > Electrical Installation / Material Handling / Processing Plants / Instrumentation
Kansanshi 12MMTPA Upgrade - Copper Processing Plant
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
:
EPC Copper Processing Plant
First Quantum Minerals
Zambia - Africa
Client Direct Award
N/A
US$ 60,000,000
2007 - 2008
Upgrade of existing 3MMTPA to 12 MMTPA Copper preparation plan inclusive of :
- Gyratory Crushing Station
- Stockpile and Reclaim conveyors
- Ball and SAG Mills
- Motor Control and Distribution Switch rooms
- Electrical and Instrumentation systems
All erection and Installation crews employed from Indonesia. All fabrication and detail engineering executed from Indonesia.
Project > Material Handling / Detailing & Drafting / Processing Plants
Kansanshi Gold Plant
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
:
EPC Gold Processing
First Quantum Minerals
Zambia - Africa
Client Direct Award
N/A
US$ 45,000,000
2006 - 2007
Design of Civil work for the Kansanshi CIP Gold Plant with scope including:
- Tank area
- Reagent area
- Gold room & Elution area
The Above included for a 3D model with production of bending schedules. Structure fabrication executed in Indonesia with export to Zambia.
Project > Control System / Electrical Installation / Engineering / Processing Plants
Kansanshi Gold Plant - Control System Integration
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
:
Control System Integration
First Quantum Minerals
Zambia - Africa
FQM
N/A
US$ 350,000
2006 - 2007
Design of Electrical, Instrumentation and Control System for the Kansanshi CIP Gold Plant with scope including :
- Programming Siemens S7 PLC
- Configuration of Citect HMI
- Containerized M.C.C / Control Room
All above provided ex Indonesia, including logistic support.
Project > Control System / Engineering / Maintenance / Processing Plants
Kiln & Burner Upgrades
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
:
EPC Control System Upgrade
INCO
Soarako, Sulawesi - Indonesia
Client Direct Award
N/A
US$ 280,000.00
2002-2003
Design, programming, development and on site commisioning of HMI and PLC system for kiln and Burner upgrade works. System included Rockwell PLC 5, RS View HMI, with interface with radio systems mounted on Kilns.
Maintenance services included the provision of 2 control system engineers to assist ongoing operations.
Project > Electrical Installation / Maintenance / Processing Plants
Gosowong Gold Mine
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
:
Commisioning Services Gold Processing
Newcrest - PT Nusa Halmahera
North Sulawesi - Indonesia
NHM - Newcrest Australia
N/A
US$ 1,120,000
1999 - 2000
Commissioning of complete process plant inclusive of the following systems
- Power Generation
- CIP Process facilities
- Elution & Electrowining
- Training of Operators
- Provision of IT services
Project > Control System / Detailing & Drafting / Engineering / Material Handling / Processing Plants / Wash Plants
Adaro Coal - Coal Processing Plant
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
:
Engineering & Construction Coal Processing Plant
ADARO
Indonesia
MBSS (Boot Contract)
N/A
US$ 12,000,000.00
2009 - 2010
Design, fabrication and erection of a 400tph Jig Coal Processing Plant including :
- Development of Wash Data
- Development of Plant Balance
- Ash curve Simulation
- Design of Material Handling System
- Design of Power House
- Erection of Plant
- Commissioning of plant
Project > Feasibility Studies / Material Handling / Processing Plants / Wash Plants
Gunung Bayan Coal - Coal Processing Plant
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
:
Feasibility & Design Study Coal Processing Plant
Bayan Resources
Indonesia
Client Direct Award
N/A
US$ 185,000.00
2008 - 2009
Audit Study associated with a 150 tph dense Media Wash wheel Coal processing plant, to determine why plant balance was producing higher ash coal than specified. Audit determined several areas of process whereby mechanical items of equipment required overhaul & replacement, to ensure high ash content was removed form the fines circuit.
Project > Feasibility Studies / Wash Plants / Processing Plants / Material Handling
SEKAKO COAL - Coal Processing Plant
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
:
Feasibility & Design Study Coal Processing Plant
SMM
Indonesia
Client Direct Award
N/A
US$ 15,000,000.00
2008 - 2009
Feasibility Study associated with a 5 MMTPA Coking Coal Processing Plant including;
- Development of Wash Data
- Development of Plant Balance
- Ash Curve Simulation
- Evaluation of Dense Media & Cyclone Process
- Evaluation of Jig Side Air Process
- Evaluation of Jig Under Air Process
The study was the basis of a Capital cost estimate ensuring a single go forward option

Project > Control System / Detailing & Drafting / Material Handling / Processing Plants / Wash Plants
Hebburn Mine Rehab. Project
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
:
Design Drafting Services Coal Processing Plants
Hunter Enviro Mining
New South Wales
Pasific Coal Technology
N/A
AUD$ 9,500,000.00
2005
This project involved the rehabilitation of the former old collery. Coal is extracted from the former tailings site and processed for sale. Funds from the sale are then used for the rehabilitation of the site This 250tph plant was completed on a design, contract management and commissioning basis. It comprises a Baum jig and cyclones, closed circuit effluent system. The entire operation is highly automated and is centrally controlled by a P.L.C. system.
Project > Detailing & Drafting / Material Handling / Processing Plants / Wash Plants
Beizhouzhuang Coal
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
:
Design Drafting Services Coal Processing Plant
Australian Coal Technologies
China
Australian Coal Technologies
N/A
AUD$ 9,500,000.00
2002
This project involved design drafting of the material handling systems and equipment selections. This 7000tph plant was completed on a design, contract management and commissioning basis. It comprises a Dense Media process. The entire operation is highly automated and is centrally controlled by a P.L.C. system.
Project > Detailing & Drafting / Material Handling / Processing Plants / Wash Plants
Rotowaro Coal
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
:
Design Drafting Services Coal Processing Plant
Coal Corp.
New Zealand
BMCH
N/A
AUD$ 6,500,000.00
1986
This 100tph re-locatable plant was completed for New Zealand States Coal Mines now Coal Corp. On a design, contract management and commissioning basis. It comprises a Baum jig and lines treatment plant. The entire operation is highly automated and is centrally controlled by a P.L.C system. The Rotowaro plant is designed to crush, clean and screen coal which was previously dumped as un-saleable coal. The main feature of the plant is that it can be relocated to any of the Coal Corp mines sites. Relocation is expected to take of the order of 8 days.
Project > Control System / Detailing & Drafting / Material Handling / Processing Plants / Wash Plants
Muswellbrook Coal
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
:
:

:
:
:
:
:
:
Design Drafting Services Coal Processing Plant
Muswellbrook Coal Co.Ltd
New South Wales
BMCH
N/A
AUD$ 8,500,000.00
1986
This 300tph plant was completed for Muswellbrook Coal Co. Ltd on a design, contract management and commissioning basis. If comprises a Baum jig and a closed circuit effluent system. The entire operation is highly automated and is centrally controlled by a P.L.C. system. The Muswellbrook plant is designed to treat the higher ash coal diverted by the auto ash analyzer as being unsuitable for supply in an unwashed form.