Material Handling                  | 
              
                |               
               | 
              
                |               
                 | Project > Engineering / EPC / Material Handling / Electrical Installation / Control System / Feasibility Studies / Project Development / Processing Plants
                 |               
               | 
              
                | KAPULLO COPPER PROJECT              
               | 
              
                Field of Activity 
                  Client 
                  Site location 
                  Main contractor 
                  Contract value 
                  Contract year 
                  Scope of work
                 | : 
                  : 
                    : 
                    : 
                    : 
                    : 
                    : 
                    
                 | Green  Field 
                  Mawson West 
                  Congo Afrika 
                  N/A  
                  US$ 12,600,000 
                  2014 / 2015 
                  CAPEX, OPEX and Detailed design of the Process Plant, via primary jaw crusher, a secondary cone crusher, ball milling and conventional rougher / cleaner flotation and filtration. Additional Project services included for EPCM support services within an integrated Owner team, as well as subcontract award of the EPC of both E&I and Piping subcontracts.
                 |               
                 |                
               | 
              
                |               
               | 
              
                |               
                 | Project > Engineering / Risk Management / Feasibility Studies / Project Development / Material Handling / Processing Plants
                 |               
               | 
              
                | RUNRUNO GOLD / MOLY PROJECT              
               | 
              
                Field of Activity 
                  Client 
                  Site location 
                  Main contractor 
                  Contract value 
                  Contract year 
                  Scope of work
                 | : 
                  : 
                    : 
                    : 
                    : 
                    : 
                    : 
                    
                 | Green Field 
                  FCF Mineral plc.  
                  Northern Phillipines 
                  FCF Mineral plc. 
                  US$ 6,500,000 
                  2014 / 2015 
                   Detailed design of a 1.8 Mtpa Crushing / Milling / Gravity / Floatation / CIL / BIOX Process facility and associated Infrastructure. Project services also included for required Risk Management and Constructibility reviews, as well as onsite commissioning and start up.  
                    
                 |               
                 |                
               | 
              
                |               
               | 
              
                |               
                 | Project > Engineering / Material Handling / Feasibility Studies / Detailing & Drafting / Project Development 
                 |               
               | 
              
                | LAMPUNUT Coal Handling Facility              
               | 
              
                Field of Activity 
                  Client 
                  Site location 
                  Main contractor 
                  Contract value 
                  Contract year 
                  Scope of work
                 | : 
                  : 
                    : 
                    : 
                    : 
                    : 
                    : 
                    
                 | Feasibility & Detail Design Coal Handling Facilities 
                  BHP BILLITON International  
                  Indonesia 
                  Client Direct Award 
                  US$ Confidential 
                  2015 
                   Detailed Design associated with a 2.5 MMTPA Coking Coal facility Deliverables included; 
                    - Upgrade of Port Facilities 
                    - Fuel Storage Facilities 
                    - Coal Handling Facilities 
                    - Diesel Power Station 
                    - Mine Infrastructure 
                    All carried out in accordance with BHPB standard Engineering practices, cognizant of Indonesian KEPMEN 555 Mining regulations 
                    
                 |               
                 |                
               | 
              
                |               
               | 
              
                |               
                 | Project > Engineering / Material Handling / Processing Plants / Detailing & Drafting / Project Development 
                 |               
               | 
              
                | AGC FLOAT GLASS BATCH PLANT              
               | 
              
                Field of Activity 
                  Client 
                  Site location 
                  Main contractor 
                  Contract value 
                  Contract year 
                  Scope of work
                 | : 
                  : 
                    : 
                    : 
                    : 
                    : 
                    : 
                    
                 | Detailed Design of Float Glass Batch Plant 
                  AGC Chemicals  
                  Cikampek, West Java, Indonesia 
                  EME Germany 
                  US$ 190,000 
                  2015 
                   Design of a 700 tpd Float Glass Batch Plant under subcontract to the German Company EME. The Scope of work requires the design in a BIM based 3D model, producing all required engineerng and shop detailing of structural steel and Silos. This project is still current with a completion date in July 2016. 
                     
                    
                 |               
                 |                
               | 
              
                |                | 
              
                |                               
                 | Project > Engineering / Material Handling / Feasibility Studies / Detailing & Drafting / Project Development 
                
                 |                 
               | 
              
                | HAJU Coal Handling Facility                               
               | 
              
                Field of Activity 
Client 
Site location 
Main contractor 
Contract value 
Contract year 
Scope of work                                              
                 | : 
: 
: 
: 
: 
: 
: 
                
                 | Feasibility & Detail Design Coal Handling Facilities 
BHP BILLITON International 
Indonesia 
Client Direct Award 
US$ Confidential 
2013 
                 Detailed Design associated with a 1 MMTPA Coking Coal facility Deliverables included; 
- Barge Loading Wharfs 
-  Fuel Storage Facilities 
-  Coal Handling Facilities 
-  Diesel Power Stations 
-  Infrastructure Facilities 
All carried out in accordance with BHPB fatal risk protocols, Standard Engineering Practices and HSEC requirements.  
                
                
                 |                 
                 |   | 
              
                |               
               | 
              
                |               
                 | Project > EPC / Material Handling / Electrical Installation / Control System
                 |               
               | 
              
                | SANGDONG TUNGSTEN / MOLY PROJECT              
               | 
              
                Field of Activity 
                  Client 
                  Site location 
                  Main contractor 
                  Contract value 
                  Contract year 
                  Scope of work
                 | : 
                  : 
                    : 
                    : 
                    : 
                    : 
                    : 
                    
                 | Brown  Field 
                  Woulfe Mining, Canada  
                  South Korea  
                  N/A  
                  US$ 2,600,000 
                  2011 / 2012 
                  Detailed design of a 1.6 Mtpa Materail Handling Plant receiving feed from an underground operation. Design also included for Grinding and Floatation Process facilties and associated Infrastructure. Included for dual GM150 2MVA VVVF drives.
                 |               
                 |                
               | 
              
                |               
               | 
              
                |               
                 | Project > Engineering / Material Handling / Processing Plants / Wash Plants  / Electrical Installation
                 |               
               | 
              
                | Newlands Coal              
               | 
              
                Field of Activity 
                  Client 
                  Site location 
                  Main contractor 
                  Contract value 
                  Contract year 
                  Scope of work
                 | : 
                  : 
                    : 
                    : 
                    : 
                    : 
                    : 
                    
                 | Coal Preparation Plant 
                  Newlands Coal 
                  Queensland Australia 
                  ACT Australia 
                  US$ 3,500,000 
                  1998 
                   Design of a 1100 tph combined Thermal and Coking CHPP Facility under subcontract to Australian Coal Technologies.
                    The Scope of work required building the design in a BIM based 3D model, producing all required shop detailing with co-ordination of fabrication processes.
                    This project is still under operation having been purchased by Xstrata Australia. 
                 |               
                 |                
               | 
              
                |               
               | 
              
                |               
                 | Project > Engineering / Risk Management / Material Handling / Marine                                                                                
                 |                                | 
              
                |                                             
                 | BENGALON COAL TERMINAL                                                                                
                 |                                | 
              
                |                                             
                 | Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work                
                 | : 
: 
: 
: 
: 
: 
: 
:
                 | Brown Field 
Kaltim Prima Coal  
East Kalimantan, Indonesia  
N/A  
US$ 1,300,000 
2011 / 2012 
Detailed design of a 9 Mtpa Coal Handling Port upgrade project, inclusive of Coal inloading as well as coal reclaiming systems. Services also included for required Risk Management workshop and Constructability reviews mass Power Station and access roads. through to operational start-up and ongoing training assistance                
                 |                 
                 |                  
                 |                                | 
              
                |                              | 
              
                |                                             
                 | Project > EPC / Material Handling / Electrical Installation / Control System                                                                                
                 |                                | 
              
                |                                             
                 | KPC OVERLAND CONVEYOR PROJECT                                                                                
                 |                                | 
              
                |                                             
                 | Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work                
                 | : 
: 
: 
: 
: 
: 
: 
:
                
                 | Brown  Field 
Kaltim Prima Coal 
East Kalimantan, Indonesia 
Roberts & Schaefer 
US$ 11,600,000 
2011 / 2012 
Design and Construction of Electrical and SCADA systems associated with a 13 Km Coal transport conveyor, including receiving stockyard stacker and Reclaimer installation. Drive systems included for dual GM150 2MVA VVVF drives.                
                 |                 
                 |                  
                 |                                | 
              
                |                              | 
              
                | 
                 | Project > Control system / Fibre Optic / Material Handling / Engineering / Electrical Installation
                  
                 |                                | 
              
                | 
                 | Coal Terminal & Ship Load out Facility                  | 
              
                Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work                                            
                 | : 
                  : 
                  : 
                  : 
                  : 
                  : 
                  : 
                  :                                              
                 | Control System Installation 
                  PT. Arutmin Indonesia 
                  North Pulu Laut, Kalimantan 
                  Client Direct Award 
                  Turnkey, Engineering, Procurement 
                  US$ 360,000.00 
                  2003 - 2004 
                  N/A                               
                 |                 
                 |                 | 
              
                                
                 | Automation of Coal Terminal Operations associated with in load  (Stacker), out load (Reclaimer) and Ship loading, inclusive of  automatic startup and load sharing of Power House generators. In  addition the system includes Head Office remote monitoring and control  via WAN and Satellite network.                                                                                
                       |                 
                 |                | 
              
                |                | 
              
                |                               
                 | Project > Engineering / Electrical Installation / Fibre Optic / Marine / Material Handling                
                  
                 |                                | 
              
                |                                             
                 | Indominco Mandiri 8 MTPA Coal Handling and Port Load out                  | 
              
                |                                             
                 | Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work                
                 | : 
: 
: 
: 
: 
: 
: 
:
                 | EPC Electrical & Instrument 
                  Sandwell Canada 
                  Indonesia 
                  Thiess Contractors Indonesia 
                  N/A 
                  US$ 4,620,000 
                  1999                               
  Turnkey Engineering, Procurement and Construction of Electrical & Instrument Systems comprising;  4 Mw Gas Turbine Power Station  HMI Control System  Instrumentation Calibration & Certification  Gas & Fire Detection  Emergency Shut Down system  High Voltage Reticulation                               
                 |                 
                 |                 | 
              
                |                              | 
              
                |                               
                 | Project > Control System / Material Handling / Wash Plant
                  
                 |                                | 
              
                | Sangatta Wash Plant                                                                                           | 
              
                Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work                                            
                 | : 
: 
: 
: 
: 
: 
: 
:
                 | Coal wash Plant Audit 
                  Kaltim Prima Coal 
                Indonesia 
                Client Direct Award 
                N/A 
                US$ 375,000 
                2007 
                Responsible for completing a value improvement review of existing wash plant with recommendations to management for upgrade to process, thereby maximizing plant capacity and efficiency. All Inline with client contract management & safety standard.                               
                 |                 
                 |                 | 
              
                |                              | 
              
                |                                             
                 | Project > Engineering  / Material Handling / Feasibility Studies / Detailing & Drafting
                  
                 |                                | 
              
                | Maruwai Stage 1 - Coal Handling Facility                                                                                             | 
              
                Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work              
                 | : 
: 
: 
: 
: 
: 
: 
:
                 | Feasibility & Design Study, Coal Handling & Port facilities 
                BHP BILLITON 
                Indonesia 
                Client Direct Award 
                N/A 
                US$ Confidential 
                2007 - 2008 
                Feasibility Study associated with a 3 MMTPA Coking Coal facility including; 
                - 2 Barge Loading Wharfs 
                - 2 Barge Unloading Wharfs 
                - 1 Fuel Unloading Wharf 
                - 2 MLtrs Fuel Storage Facilities 
                - 2 Coal Handling Facilities 
                - Drawing Format to Microstation DGN Conform all carried in accordance with BHPP fatal risk protocol, Standard Engineering Practices and HSEC requirements.                              
                 |                 
                 |                 | 
              
                |                              | 
              
                |                                             
                 | Project > Electrical Installation / Material Handling / Processing Plants / Instrumentation
                                  
                 |                                | 
              
                | Kansanshi 12MMTPA Upgrade - Copper Processing Plant                                                                                                           | 
              
                Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work              
                 | : 
: 
: 
: 
: 
: 
: 
:
                 | EPC Copper Processing Plant 
                  First Quantum Minerals 
                  Zambia - Africa 
                  Client Direct Award 
                  N/A 
                  US$ 60,000,000 
                  2007 - 2008 
                  Upgrade of existing 3MMTPA to 12 MMTPA Copper preparation plan inclusive of : 
                  - Gyratory Crushing Station 
                  - Stockpile and Reclaim conveyors 
                  - Ball and SAG Mills
                   
                - Motor Control and Distribution Switch rooms 
                - Electrical and Instrumentation systems 
                All erection and Installation crews employed from Indonesia. All fabrication and detail engineering executed from Indonesia.                               
                 |                 
                 |                 | 
              
                |                              | 
              
                |                                             
                 | Project > Feasibility Studies  / Material Handling / Wash Plants / Project Development                                                
                  
                 |                                | 
              
                | Maruwai Stage 1 - CPP                                                                                             | 
              
                Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work              
                 | : 
: 
: 
: 
: 
: 
: 
:
                 | Wash Plant & Coal Handling - Capital Estimate Review 
                BHP BILLITON International 
                Indonesia 
                Client Direct Award 
                N/A 
                US$ Confidential 
                2007 
                Capital cost estimate review associated with a 450tph Dense Medium preparation plant including : 
                - Coal Handling System 
                - Fine ore modules 
                - Coarse ore module 
                - Thickener circuit 
                - Tailing belt press circuit                              
                 |                 
                 |                 | 
              
                |                              | 
              
                |                                             
                 | Project > Engineering / Material Handling / Marine / Electrical Installation / Detailing & Drafting
                                  
                 |                                | 
              
                | F.C. Daniel                                                                                             | 
              
                Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work              
                 | : 
: 
: 
: 
: 
: 
: 
:
                 | Wash Plant & Coal Handling - Capital Estimate Review 
BHP BILLITON International 
Indonesia 
Client Direct Award 
N/A 
US$ Confidential 
2007 
Capital cost estimate review associated with a 450tph Dense Medium preparation plant including : 
- Coal Handling System 
- Fine ore modules 
- Coarse ore module 
- Thickener circuit 
- Tailing belt press circuit                                              
                 |                 
                 |                 | 
              
                |                              | 
              
                |                                             
                 | Project > Material Handling /  Detailing & Drafting / Processing Plants
                                  
                 |                                | 
              
                | Kansanshi Gold Plant                                                                                             | 
              
                Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work              
                 | : 
: 
: 
: 
: 
: 
: 
:
                 | EPC Gold Processing 
                First Quantum Minerals 
                Zambia - Africa 
                Client Direct Award 
                N/A 
                US$ 45,000,000 
                2006 - 2007 
                Design of Civil work for the Kansanshi CIP Gold Plant with scope including: 
                - Tank area 
                - Reagent area 
                - Gold room & Elution area 
                  The Above included for a 3D model with production of bending schedules. Structure fabrication executed in Indonesia with export to Zambia. 
                                                              
                 |                 
                 |                 | 
              
                |                              | 
              
                |                                             
                 | Project > Engineering / Material Handling / Feasibility Studies / Electrical Installation / Detailing & Drafting                                                
                                  
                 |                                | 
              
                | HAJU Coal Handling Facility                                                                                          | 
              
                Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work              
                 | : 
: 
: 
: 
: 
: 
: 
:
                 | Feasibility & Detail Design Coal Handling Facilities 
                BHP BILLITON International 
                Indonesia 
                Client Direct Award 
                N/A 
                US$ Confidential 
                2007 
                                              Feasibility Study & Detailed Design associated with a 1 MMTPA Coking Coal facility Deliverables included; 
- 2 Barge Loading Wharfs 
- 1 Barge Unloading Wharf 
- 2 Fuel Storage Facilities 
- 2 Coal Handling Facilities 
- 2 Diesel Power Stations 
- 2 Camp & Infrastructure Facilities 
All carried out in accordance with BHPB fatal risk protocols, Standard Engineering Practices and HSEC requirements. 
                                              
                 |                 
                 |                 | 
              
                |                              | 
              
                |                                             
                 | Project > Engineering / Electrical Installation / Material Handling                                                
                                  
                 |                                | 
              
                | PIK - Coal Handling Facility                                                                               | 
              
                Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work              
                 | : 
: 
: 
: 
: 
: 
: 
:
                 | EPC Coal Handling Facilities 
                PT. Perkasa Inakakerta (Bayan Group) 
                Kalimantan - Indonesia 
                Client Direct Award 
                N/A 
                US$ 880,000 
                2006-2007 
                Design, supply, installation and commisioning of the complete Electrical works for PIK Coal Handling Facility. Facility included Crushing 1.6KM overland/water conveyor, barge loader, reclaiming and power generation.                              
                 |                 
                 |                 | 
              
                |                              | 
              
                |                                             
                 | Project > Engineering / Detailing & Drafting / Material Handling                                                
                                  
                 |                                | 
              
                | KOGAN CREEK                                                                                             | 
              
                Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work              
                 | : 
: 
: 
: 
: 
: 
: 
:
                 | 750MW Power Station Coal Handling Station 
                Roberts & Schaefer 
                Queensland / Australia 
                Siemens 
                N/A 
                  US$ 60,000,000 
                2005-2006 
                Provision of Engineering, Fabrication and Logistic management services associated with the 1000 tph coal feed system. Document control and co ordination via America, Australia, Indonesia and Germany, through our web based QDMS system. Export to Australia of 1300 tonnes, ready for erection.                              
                 |                 
                 |                 | 
              
                |                              | 
              
                |               
                 | Project > Detailing & Drafting / Material Handling                                                
                  
                 |                                | 
              
                | Rapid Growing Project Stacker / Reclaimer Machines Contract                                                                               | 
              
                Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work              
                 | : 
: 
: 
: 
: 
: 
: 
:
                 | Drawing Services Material Handling 
                BHP BILLITON 
                Western Australia 
                Krupp Australia 
                N/A 
                US$ 20,000 
                  2006 
                    Provision of drawing services to ensure conformance to BHP Billiton Standards. Drawings converted to Micro station and processed through DGN Conform, all carried in accordance with BHPB standard engineering practices. 
                                                              
                 |                 
                 |                 | 
              
                |                              | 
              
                |               
                 | Project > Control System / Engineering / Electrical Installation / Marine / Material Handling
                  
                 |                                | 
              
                | KFT 1 - HULL388                                                                                            | 
              
                Field of Activity 
                    Client 
Site Location 
Main contractor 
Respobilites 
Contract Value 
Contract Year 
Scope of works              
                 | : 
: 
: 
: 
: 
: 
: 
:                 
                 | Control System Integration Coal Handling 
PT. Arutmin Indonesia 
North Pulu Laut, Kalimantan 
Client Direct Award 
Turnkey, Engineering, Procurement & Construction 
US$ 360,000 
2003 - 2004 
N/A                                              
                 |                 
                 |                 | 
              
                |                                             
                 | Transshipment of coal from Barges to CAPE size Vessels, via on board conveyor system without load achieved via wireless controlled ship loader. All certification to Class requirement, with stockpile capacity of 65,000 tonnes, capable of producing a homogeneous blend via proportional control of 3 stockpile drag chain feeders. Alternatively the in load system is capable of direct feed to the ship loader via an in load system consisting4 Grab Cranes, each with 32 tonne capacity, with blending from in load hoppers and proportionally controlled belt feeders.
                 
                       |                 
                 |                                | 
              
                |                              | 
              
                |                                             
                 | Project > Engineering / Electrical Installation / Detailing / Material Handling / Project Development
                                  
                 |                                | 
              
                | Kaltim Prima Coal 12 MTPA Coal Handling Facility                                                                                      | 
              
                Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work              
                 | : 
: 
: 
: 
: 
: 
: 
:
                 | EPC Coal Handling Systems 
                Bumi Resources 
                Indonesia 
                J/O Roberta & Schaefer USA 
                N/A 
                US$ 22,000,000 
                2004 - 2005 
                Turnkey EPC associated with new Dump Station, Primary and Secondary crushing, Stockpiling and Automated reclaim blending, interfacing with the existing 13 KM overland conveyor to the port side                              
                 |                 
                 |                 | 
              
                |                              | 
              
                |                                             
                 | Project > Electrical Installation / Engineering / Material Handling / Project Development                                                
                  
                 |                                | 
              
                | Binamitra Coal Handling Facility                                                                                             | 
              
                Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work              
                 | : 
: 
: 
: 
: 
: 
: 
:
                 | EPC Coal Handling Systems 
                PT. Adaro Indonesia 
                Kalimantan - Indonesia 
                Client Direct Award 
                Turnkey, Engineering, Procurement & Construction 
                US$ 3,600,000 
                2003 - 2004 
                N/A                              
                 |                 
                 |                 | 
              
                                    
                 | Engineering procurement and construction of a 3MMTPA coal handling facility located in remote Kalimantan. 
System included for the following : 
- Power Generation & Distribution 
- General light and power 
- Conveyor System and Barge Load Out                                                                                
                       |                 
                 |                | 
              
                |                              | 
              
                |               
                 | Project > Electrical Installation / Material Handling / Power Generation
                                  
                 |                                | 
              
                | Grab Crane Installation                                                                                             | 
              
                Field of Activity 
                  Client 
                    Site Location 
                    Main contractor 
                    Respobilites 
                    Contract Value 
                    Contract Year 
                    Scope of works
                 | : 
                  : 
                  : 
                  : 
                  : 
                  : 
                  : 
                  :
                 | Paiton Energy Power Station EPC Coal Handling Systems 
                Paiton Energy 
                Java - Indonesia 
                client Direct Award 
                Turnkey, Engineering, Procurement & Construction 
                US$ 5,000,000 
                2004 
                N/A                                            
                 |                 
                 |                 | 
              
                | 
                 | Engineering and Installation of 2 off Barge unloading Grab Cranes associated with the Power Station coal in-load system included HV reticulation, Fire alarm and Control Systems.                                                        
                       |                 
                 |                                | 
              
                |                | 
              
                |                               
                 | Project > Control System / Detailing & Drafting /  Engineering / Material Handling / Processing Plants / 
                    Wash Plants                                                
                                  
                 |                                | 
              
                | Adaro Coal - Coal Processing Plant                                                                                             | 
              
                Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work              
                 | : 
: 
: 
: 
: 
: 
: 
:                 
                 | Engineering & Construction Coal Processing Plant 
ADARO 
Indonesia 
MBSS (Boot Contract) 
N/A 
US$ 12,000,000.00 
2009 - 2010 
Design, fabrication and erection of a 400tph Jig Coal Processing Plant including : 
- Development of Wash Data 
- Development of Plant Balance 
- Ash curve Simulation 
- Design of Material Handling System 
- Design of Power House 
- Erection of Plant 
- Commissioning of plant                              
                 |                 
                 |                 | 
              
                |                              | 
              
                |                                             
                 | Project > Feasibility Studies / Material Handling / Processing Plants / Wash Plants                                                
                  
                 |                                | 
              
                | Gunung Bayan Coal - Coal Processing Plant                                                                                             | 
              
                Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work              
                 | : 
: 
: 
: 
: 
: 
: 
:                 
                 | Feasibility & Design Study Coal Processing Plant 
                  Bayan Resources 
                  Indonesia 
                  Client Direct Award 
                  N/A 
                  US$ 185,000.00 
                  2008 - 2009 
                  Audit Study associated with a 150 tph dense Media Wash wheel Coal processing plant, to determine why plant balance was producing higher ash coal than specified. Audit determined several areas of process whereby mechanical items of equipment required overhaul & replacement, to ensure high ash content was removed form the fines circuit.                                                
                 |                 
                 |                 | 
              
                |                              | 
              
                |                                             
                 | Project > Feasibility Studies / Wash Plants / Processing Plants / Material Handling
                 |                                | 
              
                | SEKAKO COAL - Coal Processing Plant                                                                                              | 
              
                Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work              
                 | : 
: 
: 
: 
: 
: 
: 
:                 
                 | Feasibility & Design Study Coal Processing Plant 
SMM 
Indonesia 
Client Direct Award 
N/A 
US$ 15,000,000.00 
2008 - 2009 
Feasibility Study associated with a 5 MMTPA Coking Coal Processing Plant including;  
- 
                  Development of Wash Data  
- 
                  Development of Plant Balance  
- 
                  Ash Curve Simulation 
- 
                  Evaluation of Dense Media & Cyclone Process 
- 
                  Evaluation of Jig Side Air Process 
- 
                  Evaluation of Jig Under Air Process  
The study was the basis of a Capital cost estimate ensuring a single go forward option                                               
                 |                 
                 |                 | 
              
                |                              | 
              
                |                                             
                 | Project > Control System / Detailing & Drafting / Material Handling / Processing Plants / Wash Plants                                                 
                  
                 |                                | 
              
                | Hebburn Mine Rehab. Project                                                                                             | 
              
                Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work              
                 | : 
: 
: 
: 
: 
: 
: 
:                 
                 | Design Drafting Services Coal Processing Plants 
Hunter Enviro Mining 
New South Wales 
Pasific Coal Technology 
N/A 
AUD$ 9,500,000.00 
2005 
This project involved the rehabilitation of the former old collery. Coal is extracted from the former tailings site and processed for sale. Funds from the sale are then used for the rehabilitation of the site This 250tph plant was completed on a design, contract management and commissioning basis. It comprises a Baum jig and cyclones, closed circuit effluent system. The entire operation is highly automated and is centrally controlled by a P.L.C. system. 
                                              
                 |                 
                 |                 | 
              
                |                              | 
              
                |                                             
                 | Project > Detailing & Drafting / Material Handling / Processing Plants / Wash Plants
                 |                                | 
              
                | Beizhouzhuang Coal                                                                                              | 
              
                Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work              
                 | : 
: 
: 
: 
: 
: 
: 
:                 
                 | Design Drafting Services Coal Processing Plant 
Australian Coal Technologies 
China 
Australian Coal Technologies 
N/A 
AUD$ 9,500,000.00 
2002 
This project involved design drafting of the material handling systems and equipment selections. This 7000tph plant was completed on a design, contract management and commissioning basis. It comprises a Dense Media process.  The entire operation is highly automated and is centrally controlled by a P.L.C. system.  
                                                              
                 |                 
                 |                 | 
              
                |                              | 
              
                |                                             
                 | Project > Detailing & Drafting / Material Handling / Processing Plants / Wash Plants                                                 
                  
                 |                                | 
              
                | Rotowaro Coal                                                                                             | 
              
                Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work                                            
                 | : 
: 
: 
: 
: 
: 
: 
:                 
                 | Design Drafting Services Coal Processing Plant 
Coal Corp. 
New Zealand 
BMCH 
N/A 
AUD$ 6,500,000.00 
1986 
This 100tph re-locatable plant was completed for New Zealand States Coal Mines now Coal Corp. On a design, contract management and commissioning basis. It comprises a Baum jig and lines treatment plant. The entire operation is highly automated and is centrally controlled by a P.L.C system. The Rotowaro plant is designed to crush, clean and screen coal which was previously dumped as un-saleable coal. The main feature of the plant is that it can be relocated to any of the Coal Corp mines sites. Relocation is expected to take of the order of 8 days.  
                                                              
                 |                 
                 |                 | 
              
                |                              | 
              
                |                                             
                 | Project > Control System / Detailing & Drafting / Material Handling / Processing Plants / Wash Plants                                                 
                                  
                 |                                | 
              
                | Muswellbrook Coal                                                                                             | 
              
                Field of Activity 
Client 
Site location 
Main contractor 
Responbilities 
Contract value 
Contract year 
Scope of work              
                 | : 
: 
: 
: 
: 
: 
: 
:                 
                 | Design Drafting Services Coal Processing Plant 
Muswellbrook Coal Co.Ltd 
New South Wales 
BMCH 
N/A 
AUD$ 8,500,000.00 
1986 
This 300tph plant was completed for Muswellbrook Coal Co. Ltd on a design, contract management and commissioning basis. If comprises a Baum jig and a closed circuit effluent system. The entire operation is highly automated and is centrally controlled by a P.L.C. system. The Muswellbrook plant is designed to treat the higher ash coal diverted by the auto ash analyzer as being unsuitable for supply in an unwashed form.  
                                                              
                 |                 
                 |                 | 
              
                |                              | 
              