Heat Tracing |
|
| Project > Electrical Installation / Engineering / Heat Tracing / Oil & Gas
| |
Suban II Gas Gathering Station |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Electric Heating Technology
Conoco Philips
Jambi - Indonesia
Thiess Contractors Indonesia
Engineering, Procurement & Installation Supervision
US$ 54,000.00
2006
Heat Trace Design
Provision of design, procurement and Installation supervision of lines to prevent condensation of flare gas, all in accordance with required HAZOP.
|
|
|
|
| Project > Electrical Installation / Heat Tracing / Marine
| |
FPSO CAPIXABA |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Electric Heating Technology
Keppel Shipyard / JC Marine
Singapore
SBM
Turnkey, Engineering, Procurement & Construction
US$ 65,000.00
2006
Heat Trace design and Installation
|
|
|
| The work scope on the former Stena Congress includes installation and integration of topside modules; the fabrication and installation of the internal turret, flare tower, pipe rack and helideck; and installation of a hose reel at the stern for offloading to export vessels. FPSO Capixaba is capable of producing 100,000 barrels of oil per day (bopd) with a storage capacity of two million barrels.
| |
|
| Project > Electrical Installation / Engineering / Heat Tracing / Oil & Gas
| |
FPSO "Companion / Anasuria" |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Essential Power Distribution
Shell Petroleum Development Company
Nigeria
Halliburton West Africa Limited
N/A
US$ 156,000.00
2002
Design and supply of essential desitribution boards & Transformers to class requirements.
|
|
|
| Designed to separate produced oil, water and gas, compress produced gas and treat produced water, the topside facilities can accomodate a total of 170,000 barrels of well fluids and 100 million standard cubic feet of gas per day. The vessel hull has an oil storage capacity of 1.4 million barrels.
| |
|
| Project > Electrical Installation / Engineering / Heat Tracing / Oil & Gas
| |
Central Processing Platform No. 3 |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Electric Heating Technology
VSP / Petechim
Vietnam
Keppel FELS & TOEPL (Technics Offshore Engineering)
N/A
460,000 EUR
2002
N/A
|
|
|
|
| Project > Electrical Installation / Engineering / Heat Tracing / Oil & Gas
| |
FPSO " Sea Eagle" |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| BEH Electrical Heat Trace
Shell Petroleum Development Company
Nigeria
Halliburton West Africa Limited
N/A
US$ 1,560,000.00
2002
Skid Heat Trace Design & Installation
|
|
|
| Vessel Specification : Designed to separate produced oil, water and gas, compress produced gas and treat produced water, the topside facilities can accomodate a total of 170,000 barrels of well fluids and 100 million standard cubic feet of gas per day. The vessel hull has an oil storage capacity of 1.4 million barrels.
|
| |
|
| Project > Electrical Installation / Engineering / Heat Tracing / Oil & Gas
| |
FPSO "Panyu" |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| BEH Electrical Heat Trace
CNOOC
N/A
CONHW
N/A
US$ 36,000.00
2002
Skid Heat trace design & Installation
|
|
|
| Vessel Specification : The FPSO vessel is a new build 160 000 DWT vessel and will be moored in a passive mode. Mooring and vessel are designed to withstand the 100-year typhoon of 13.1 m significant wave height and wind speeds up 200km/h.
| |
|
| Project > Electrical Installation / Engineering / Heat Tracing / Oil & Gas
| |
Kerteh Centralised Tankage Facility 2 |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Electric Heating Technology
Dialog E & C
Kerteh, Malaysia
Mikuni (M) Sdn Bhd, Best Wide Matric & Bartec Pte Ltd
N/A
312.000 EUR
2000 - 2001
Design, Engineering, Supply Installation, Testing, Commisioning and Documentation.
|
|
|
back to top |
|