Wash Plants |
|
| Project > Control System / Material Handling / Wash Plant
| |
| Sangatta Wash Plant
|
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Coal wash Plant Audit
Kaltim Prima Coal
Indonesia
Client Direct Award
N/A
US$ 375,000
2007 - 2008
Responsible for completing a value improvement review of existing wash plant with recommendations to management for upgrade to process, thereby maximizing plant capacity and efficiency. All Inline with client contract management & safety standard.
|
| |
|
| Project > Engineering / Material Handling / Processing Plants / Wash Plants / Electrical Installation
|
|
Newlands Coal |
Field of Activity
Client
Site location
Main contractor
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
| Coal Preparation Plant
Newlands Coal
Queensland Australia
ACT Australia
US$ 3,500,000
1998
Design of a 1100 tph combined Thermal and Coking CHPP Facility under subcontract to Australian Coal Technologies.
The Scope of work required building the design in a BIM based 3D model, producing all required shop detailing with co-ordination of fabrication processes.
This project is still under operation having been purchased by Xstrata Australia.
|
|
|
|
| Project > Feasibility Studies / Material Handling / Project Development / Wash Plants
| |
Maruwai Stage 1 - CPP |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Wash Plant & Coal Handling - Capital Estimate Review
BHP BILLITON International
Indonesia
Client Direct Award
N/A
US$ Confidential
2007
Capital cost estimate review associated with a 450tph Dense Medium preparation plant including :
- Coal Handling System
- Fine ore modules
- Coarse ore module
- Thickener circuit
- Tailing belt press circuit
|
| |
|
| Project > Control System / Detailing & Drafting / Engineering / Material Handling / Processing Plants / Wash Plants
| |
Adaro Coal - Coal Processing Plant |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Engineering & Construction Coal Processing Plant
ADARO
Indonesia
MBSS (Boot Contract)
N/A
US$ 12,000,000.00
2009 - 2010
Design, fabrication and erection of a 400tph Jig Coal Processing Plant including :
- Development of Wash Data
- Development of Plant Balance
- Ash curve Simulation
- Design of Material Handling System
- Design of Power House
- Erection of Plant
- Commissioning of plant
|
| |
|
| Project > Feasibility Studies / Material Handling / Processing Plants / Wash Plants
| |
Gunung Bayan Coal - Coal Processing Plant |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Feasibility & Design Study Coal Processing Plant
Bayan Resources
Indonesia
Client Direct Award
N/A
US$ 185,000.00
2008 - 2009
Audit Study associated with a 150 tph dense Media Wash wheel Coal processing plant, to determine why plant balance was producing higher ash coal than specified. Audit determined several areas of process whereby mechanical items of equipment required overhaul & replacement, to ensure high ash content was removed form the fines circuit.
|
| |
|
| Project > Feasibility Studies / Wash Plants / Processing Plants / Material Handling
| |
SEKAKO COAL - Coal Processing Plant |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Feasibility & Design Study Coal Processing Plant
SMM
Indonesia
Client Direct Award
N/A
US$ 15,000,000.00
2008 - 2009
Feasibility Study associated with a 5 MMTPA Coking Coal Processing Plant including;
-
Development of Wash Data
-
Development of Plant Balance
-
Ash Curve Simulation
-
Evaluation of Dense Media & Cyclone Process
-
Evaluation of Jig Side Air Process
-
Evaluation of Jig Under Air Process
The study was the basis of a Capital cost estimate ensuring a single go forward option
|
| |
|
| Project > Control System / Detailing & Drafting / Material Handling / Processing Plants / Wash Plants
| |
Hebburn Mine Rehab. Project |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Design Drafting Services Coal Processing Plants
Hunter Enviro Mining
New South Wales
Pasific Coal Technology
N/A
AUD$ 9,500,000.00
2005
This project involved the rehabilitation of the former old collery. Coal is extracted from the former tailings site and processed for sale. Funds from the sale are then used for the rehabilitation of the site This 250tph plant was completed on a design, contract management and commissioning basis. It comprises a Baum jig and cyclones, closed circuit effluent system. The entire operation is highly automated and is centrally controlled by a P.L.C. system.
|
| |
|
| Project > Detailing & Drafting / Material Handling / Processing Plants / Wash Plants
| |
Beizhouzhuang Coal |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Design Drafting Services Coal Processing Plant
Australian Coal Technologies
China
Australian Coal Technologies
N/A
AUD$ 9,500,000.00
2002
This project involved design drafting of the material handling systems and equipment selections. This 7000tph plant was completed on a design, contract management and commissioning basis. It comprises a Dense Media process. The entire operation is highly automated and is centrally controlled by a P.L.C. system.
|
| |
|
| Project > Detailing & Drafting / Material Handling / Processing Plants / Wash Plants
| |
Rotowaro Coal |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Design Drafting Services Coal Processing Plant
Coal Corp.
New Zealand
BMCH
N/A
AUD$ 6,500,000.00
1986
This 100tph re-locatable plant was completed for New Zealand States Coal Mines now Coal Corp. On a design, contract management and commissioning basis. It comprises a Baum jig and lines treatment plant. The entire operation is highly automated and is centrally controlled by a P.L.C system. The Rotowaro plant is designed to crush, clean and screen coal which was previously dumped as un-saleable coal. The main feature of the plant is that it can be relocated to any of the Coal Corp mines sites. Relocation is expected to take of the order of 8 days.
|
| |
|
| Project > Control System / Detailing & Drafting / Material Handling / Processing Plants / Wash Plants
| |
Muswellbrook Coal |
Field of Activity
Client
Site location
Main contractor
Responbilities
Contract value
Contract year
Scope of work
| :
:
:
:
:
:
:
:
| Design Drafting Services Coal Processing Plant
Muswellbrook Coal Co.Ltd
New South Wales
BMCH
N/A
AUD$ 8,500,000.00
1986
This 300tph plant was completed for Muswellbrook Coal Co. Ltd on a design, contract management and commissioning basis. If comprises a Baum jig and a closed circuit effluent system. The entire operation is highly automated and is centrally controlled by a P.L.C. system. The Muswellbrook plant is designed to treat the higher ash coal diverted by the auto ash analyzer as being unsuitable for supply in an unwashed form.
|
|
|